Concrete block or stream concrete basement walls command a different approach when attach paneling . Use woodwind framing as a foundation to attach the pane on bare walls , or attach pane straightaway to antecedently finished basement walls .
Step 1
end up cellar walls , such as those with painted drywall or dry wall , do not require much preparation to attach paneling . rinse the walls with hot , unctuous water to remove soil that will slim the adherence of the glue used to attach paneling to the walls . If drywall or wallboard has been put on the walls , but have not been painted , do not wash the walls .
Step 2
Glue paneling to finished walls . Apply the mucilage in a zigzag - zag pattern on the back of the pane . enforce gum 3 inches from all four edges . Use a level to check that the edge is plumb and press against the wall . Use a gumshoe mallet to tap the paneling in place . pound sign a panel nail in each recess to hold the panelling in position while the glue dries .
Step 3
Step 4
geld pane to fit around outlets , windows or other obstructions . Cut it face up down with a radial saw or face up with a hand saw .
Unfinished Concrete Block or Poured Concrete Walls
Unfinished concrete city block or poured concrete bulwark require preparation for paneling . Basement wall easily become moist so implement a sealant or gamy - quality waterproofing software to the wall .
Apply painter ’s tape to any expanse that are contiguous to the basement bulwark .
go for the sealant or waterproof to the concrete block or poured concrete wall with a paintbrush and roll . habituate a paintbrush to create a 3 - inch border of sealant or waterproofing , also squall " cutting in , " around the edges and obstruction such as windows or outlets . Use a paint roller to paint all large surface . let to dry out soundly fit in to the manufacturer ’s directions posit on the sealant or piddle - proofing product .

Step 5
set up the pliant vapor barrier with a spray adhesive . Avoid punctures in the plastic since kettle of fish will disgrace the function of the vapor barrier .
Step 6
expend true fir strips or 2x4s to frame the area . Use Tapcon or other screwing design specifically for concrete block and poured concrete to seize the prefer frame .
Step 7
deploy the vertical framing 16 inch apart on center . This means that there should be 16 inches from the center of one framing fir strip or 2x4 to the meat of the next true fir strip or 2x4 . set up horizontal framing at the top , center and bottom of the area .
Step 8
Step 9
watch each frame board with a level to check that the board is plumb . If not , plaza shims behind the board to shim it so it is plumb . Cut man for around outlets , ventilation ducts , windows or other obstructions .
Step 10
Attach the paneling with gore nail . set up one nail every 12 in along the edges and every 16 inch on heart and soul . When attaching the paneling to framing around window , electric outlet or other areas , install panel nails every 3 to 5 inches .